This modern apartment project will be located within one of the most distinctive complexes in the Caribbean "VISTACANA", with 1, 2 and 3 bedroom apartments, where you can enjoy spaces designed especially for you with views of Grand Central Park.
Integrating an exclusive Hotel Lobby and 4-level buildings with state-of-the-art elevators, keeping us at the forefront of the market, adding value in its architecture and a vibrant and distinguished Caribbean atmosphere.
Located 10 minutes from Punta Cana International Airport in the Dominican Republic, 5 minutes from the most beautiful beaches of turquoise waters of the Caribbean and 15 minutes from the first and only theme park in the Caribbean "Katmandu Park".
We are inspired by a lifestyle that promotes good living under the harmony of nature, looking for residents to enjoy a pleasant environment, attached to the principle of respect and fraternity.
Amenities:
- Park Sauna & Spa
- Pets Friendly
- Green spot for electric vehicle charging
- Grand Central Park
- The Woods Restaurant
- Garden Cigar with furnished and air-conditioned Billiard Room
- Pool Lounge and Solaris Desk
- Run & Play Kids Park
- Coworking Space
- Gym
Terminations:
- Smooth finish on walls (certain restrictions apply)
- General porcelain tile floors
- Imported ceramics in bathrooms
-Finishing of ceilings and cornices in plaster.
- Precious wood engineered doors and closets
- Modular kitchen cabinets, with top and blacksplash in natural granite
Project characteristics:
Gated project with 24/7 security.
- 4-story building with state-of-the-art elevators and full power plant.
- Electric gate and audio intercom with digitized access control
- 2 drinking water pumps (one for continuous use and one for emergency use)
- Appliances and air conditioners included in all apartments
- 9 apartment models to choose from
Prices
from US$93,500. Up to US$205,000.
Floor area from 52m2 to 128m2
Form of payment:
Set aside 10% of the unit for reservation and contract.
40% → To be completed by September 2024
Initial (during construction)
50% → Final Payment in November 2024
Upon delivery of your unit
Start of construction → August 2023
Delivery date: November 2024
Contact us and one of our representatives will provide you with personalized assistance.